BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Byron Resource Recovery Centre | Recyclables and green waste | ||||
Green waste – tree stumps, logs, roots | $118.18 | $11.82 | $130.00 | |
Per tonne
|
||||
Green waste – minimum charge | $13.64 | $1.36 | $15.00 | |
Per load, min charge
|
||||
Green waste - per tonne | $95.45 | $9.55 | $105.00 | |
Per tonne
|
||||
Recyclables - mixed, cardboard, polystyrene | $4.55 | $0.45 | $5.00 | |
Up to 100kg |
||||
Recyclables - mixed, cardboard, polystyrene | $90.91 | $9.09 | $100.00 | |
Per tonne, loads greater than 100kg |
||||
BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Byron Resource Recovery Centre | Pasteurised garden organics | ||||
Pasteurised garden organics | $6.82 | $0.68 | $7.50 | |
Pasteurised garden organics - Bulk loads |
POA
|
|||
For orders 100m3 and over
|
||||
Pasteurised garden organics | $34.55 | $3.45 | $38.00 | |
Per cubic metre
|
||||
BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Byron Resource Recovery Centre | Metals and tyres | ||||
Dirty / contaminated tyres | $18.18 | $1.82 | $20.00 | |
Caravans (unstripped) | $327.27 | $32.73 | $360.00 | |
Per tonne
|
||||
Car bodies and caravans (stripped) | $45.45 | $4.55 | $50.00 | |
Per vehicle
|
||||
Scrap metal | $36.36 | $3.64 | $40.00 | |
Per tonne
|
||||
Tyres – car | $14.55 | $1.45 | $16.00 | |
Tyres – 4 wheel drive / light truck | $16.36 | $1.64 | $18.00 | |
Tyres – motor cycle | $14.55 | $1.45 | $16.00 | |
Tyres – truck (17.5+) / forklift / bobcat / super single | $72.73 | $7.27 | $80.00 | |
Tyres - tractor small | $145.45 | $14.55 | $160.00 | |
Tyres - tractor large | $263.64 | $26.36 | $290.00 | |
Tyres - earth moving small | $250.00 | $25.00 | $275.00 | |
Tyres - earth moving medium | $522.73 | $52.27 | $575.00 | |
Tyres - earth moving large | $1,090.91 | $109.09 | $1,200.00 | |
BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Byron Resource Recovery Centre | Oil and paint | ||||
Paint (commercial) | $1.36 | $0.14 | $1.50 | |
Per litre |
||||
Oil (commercial quantities) | $0.18 | $0.02 | $0.20 | |
Per litre
|
||||
Oil (domestic quantities) |
No charge
|
|||
Motor and other oil, up to 20L
|
||||
Paint (domestic quantities) |
No charge
|
|||
Up to 20L
|
||||
BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Byron Resource Recovery Centre | Batteries, gas bottles and whitegoods | ||||
Gas bottles (commercial quantities, over 5) | $9.09 | $0.91 | $10.00 | |
Per bottle, greater than 5 bottles
|
||||
Gas bottles (domestic quantities) |
No charge
|
|||
Gassed whitegoods (fridges, aircon units, etc.) | $45.45 | $4.55 | $50.00 | |
Without degas certificate
|
||||
Lead acid batteries |
No charge
|
|||
BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Byron Resource Recovery Centre | Light globes and smoke detectors | ||||
Fluorescent light globes (commercial quantities) | $0.45 | $0.05 | $0.50 | |
Per globe
|
||||
Fluorescent light globes (domestic quantities) |
No charge
|
|||
Smoke detectors (domestic quantities) |
No charge
|
|||
Less than 10kg
|
||||
BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Byron Resource Recovery Centre | Resource Recovery | ||||
Sorted concrete, bricks and tiles | $227.27 | $22.73 | $250.00 | |
100% sorted only No porcelain or caesar stone. |
||||
Sorted Gyprock | $272.73 | $27.27 | $300.00 | |
Per tonne 100% sorted only |
||||
Mattress (recycled) | $31.82 | $3.18 | $35.00 | |
Double mattress or larger |
||||
BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Byron Resource Recovery Centre | Waste products | ||||
Vehicle - weight only | $5.45 | $0.55 | $6.00 | |
Bulk loads putrescible waste (commercial quantities) |
POA
|
|||
Per tonne
|
||||
Construction and demolition waste | $16.36 | $1.64 | $18.00 | |
Per tonne, min charge
Mixed
|
||||
Construction and demolition waste mixed | $327.27 | $32.73 | $360.00 | |
Per tonne
Mixed
|
||||
Electronic waste (commercial quantities) | $68.18 | $6.82 | $75.00 | |
Per tonne
|
||||
Excavated material – clean soil, dirt, sand |
POA
|
|||
Subject to operational requirements, EPA assessment standards and approval by Council Officer
|
||||
General mixed waste | $16.36 | $1.64 | $18.00 | |
Per load, min charge
|
||||
General mixed waste | $327.27 | $32.73 | $360.00 | |
Per tonne
|
||||
BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Byron Resource Recovery Centre | Bulk Waste | ||||
Special Waste Collection Contribution | $65.00 | $6.50 | $71.50 | |
BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Byron Resource Recovery Centre | Contamination fee | ||||
Contaminated waste clean-up fee | $545.45 | $54.55 | $600.00 | |
Asbestos is not accepted at the Byron Resource and Recovery Centre. Disposal charges are in addition to the clean up fee. |
||||
BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Byron Resource Recovery Centre | Other charges | ||||
Compost bins | $63.64 | $6.36 | $70.00 | |
Asbestos kits | $45.45 | $4.55 | $50.00 | |
Kitchen caddy | $9.09 | $0.91 | $10.00 | |
Vehicle registration | $45.45 | $4.55 | $50.00 | |
Worm farms | $77.27 | $7.73 | $85.00 | |
BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Resource Recovery Services | Additional services | ||||
Additional servicing of Council's public place waste and recycling bins |
POA
|
|||
Resulting from events
|
||||
Additional servicing of waste, recycling or organic mobile garbage bins |
POA |
|||
Outside of Council's regular service schedule
|
||||
Bin replacement cost | $92.00 | $0.00 | $92.00 | |
BYRON SHIRE COUNCIL | INFRASTRUCTURE SERVICES | Resource Recovery Services | 3 Bin sort system | ||||
Subsidy for Business participating in Resource Recovery Avoidance and Reuse Program |
POA
|