Online Search Facility
61 Fees & Charges Show tree view
Hornsby Shire Council | Construction | 1. Gutter Crossings – Pipe crossings, including pipes up to 375mm diameter and headwalls
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
a. Crossings up to 4.8m long | $3,163.64 | $316.36 | $3,480.00 | |
b. Each additional 1.2 m or part to maximum 9.6m | $532.73 | $53.27 | $586.00 |
Hornsby Shire Council | Construction | 2. Vehicular Crossings – Concrete (excluding layback) | Residential gateways up to 2.5m wide and gutter width up to 3.5m clear width at kerb (125mm thick with SL62 mesh). Includes fee for supervision of crossing construction and provision of levels (item 6.I. below)
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
a. Distance between boundary and kerb 3.5m | $3,490.91 | $349.09 | $3,840.00 | |
b. Distance between boundary and kerb 4m | $4,054.55 | $405.45 | $4,460.00 | |
c. Distance between boundary and kerb 4.5m | $4,618.18 | $461.82 | $5,080.00 | |
d. Distance between boundary and kerb 5.5m | $5,750.00 | $575.00 | $6,325.00 |
Hornsby Shire Council | Construction | 2. Vehicular Crossings – Concrete (excluding layback) | Residential gateways up to 2.5m wide and gutter width up to 3.5m clear width at kerb (125mm thick with SL62 mesh) in conjunction with Hornsby Council road upgrade project
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
e. Distance between boundary and kerb 3.5m | $2,400.00 | $240.00 | $2,640.00 | |
f. Distance between boundary and kerb 4m | $2,836.36 | $283.64 | $3,120.00 | |
g. Distance between boundary and kerb 4.5m | $3,277.27 | $327.73 | $3,605.00 | |
h. Distance between boundary and kerb 5.5m | $4,150.00 | $415.00 | $4,565.00 |
Hornsby Shire Council | Construction | 2. Vehicular Crossings – Concrete (excluding layback) | Areas over items 2.a to 2.h above and Heavy Duty/Commercial crossings to be charged at following rates
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
i. The area of concrete in addition to above to be charged for at rate per square metre: | $376.82 | $37.68 | $414.50 | |
j. Heavy Duty (150mm thick and reinforced with SL82) | $421.36 | $42.14 | $463.50 | |
k. Commercial and industrial crossings (200mm thick and reinforced with two (2) layers of SL82) | $547.27 | $54.73 | $602.00 |
Hornsby Shire Council | Construction | 3. Laybacks
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
a. Cut and turn kerb only (4.5m overall length) incl. saw cut | $1,727.27 | $172.73 | $1,900.00 | |
b. Each additional metre | $321.36 | $32.14 | $353.50 | |
c. Cut and turn kerb in conjunction with crossover (4.5 m overall length) | $1,504.55 | $150.45 | $1,655.00 | |
d. Each additional metre | $294.09 | $29.41 | $323.50 | |
e. Provide layback only (4.5m overall length) | $2,154.55 | $215.45 | $2,370.00 | |
f. Each additional metre | $431.82 | $43.18 | $475.00 | |
g. Provide layback in conjunction with crossover (4.5m overall length) | $1,872.73 | $187.27 | $2,060.00 | |
h. Each additional metre | $401.82 | $40.18 | $442.00 |
Hornsby Shire Council | Construction | 4. Adjusting Utility Services
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
a. Adjusting Utility Services in conjunction with vehicular crossing construction |
At cost + 10%
|
Hornsby Shire Council | Construction | 5. Concrete Sawing
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
a. Concrete sawing in conjunction with vehicular crossing construction |
At cost + 10%
|
Hornsby Shire Council | Construction | 6. Miscellaneous – Construction
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
a. Provide 100mm thick concrete slab to support pavers (allowing for extra excavation) – per sq.m | $325.45 | $32.55 | $358.00 | |
b. Pipe headwalls (where constructed separately) – each | $369.55 | $36.96 | $406.50 | |
c. Asphalt seal (30mm thick) where existing base is suitable – per sq.m | $347.73 | $34.77 | $382.50 | |
d. Provision of base course of 150mm road base material – per sq.m | $200.91 | $20.09 | $221.00 | |
e. Asphalt seal + provision of base course – per sq.m | $548.64 | $54.86 | $603.50 | |
f. Footpath paving 80mm thick – per sq.m | $267.27 | $26.73 | $294.00 | |
g. Kerbing and guttering – 150mm kerb – per lin.m | $403.18 | $40.32 | $443.50 | |
h. Adjustments to 100mm diameter stormwater pipes – min charge/metre | $97.72 | $9.77 | $107.50 | |
i. Fee for supply of plans and supervision of crossings for construction by private contractor | $431.00 | $0.00 | $431.00 | |
Paving requires an additional inspection*
|
||||
j. Fee for supervision of crossing where levels have previously been provided | $215.50 | $0.00 | $215.50 | |
k. Fee for supply of vehicular crossing design levels for the purpose of ensuring correct matching of levels at boundary | $215.50 | $0.00 | $215.50 | |
l. Fee for supervision of crossing construction by Council’s contractor (includes issue of levels) | $431.00 | $0.00 | $431.00 | |
m. Additional inspections regarding * above or where otherwise required – each | $140.00 | $0.00 | $140.00 | |
n. Fee for changing Authorised Contractor once plans have been issued (item 6.i or 6.j above) | $108.00 | $0.00 | $108.00 |
Hornsby Shire Council | Construction | 7. Authorised contractors – vehicular crossings
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
a. Registration Fee | $489.00 | $0.00 | $489.00 | |
b. Annual Fee | $244.50 | $0.00 | $244.50 |
Hornsby Shire Council | Construction | 8. Tender Documents
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
a. Paper copy | $334.00 | $0.00 | $334.00 | |
b. Electronic – via Tenderlink | $0.00 | $0.00 | $0.00 |
Hornsby Shire Council | Planning and Building | Development Assessments | Part 9 Other fees
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
9.4 Submitting application for construction certificate, subdivision works certificate, occupation certificate, subdivision certificate, building information certificate or complying development certificate on the NSW planning portal | $44.53 | $0.00 | $44.53 |
Hornsby Shire Council | Planning and Building | Development Assessments | Subdivision Services | Subdivision Certificate – Linen Release | Torrens Title | Lodgement Fee for Subdivision Certificate – per lot:
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Inspection fee for Principal Certifying Authority when Council did not issue construction certificate and/or compliance certificates – Fee per hour or part thereof | $210.00 | $0.00 | $210.00 |
Hornsby Shire Council | Planning and Building | Building Services | Construction Certificates | Building Class 1 and 10 Structures
By Quotation OR
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Granny Flat | $490.91 | $49.09 | $540.00 | |
Dwelling-house | $619.09 | $61.91 | $681.00 | |
Alterations and additions | $323.64 | $32.36 | $356.00 | |
Swimming pool | $294.55 | $29.45 | $324.00 | |
Shed or garage | $294.55 | $29.45 | $324.00 | |
Minor Structure (decks, carports, retaining walls) | $224.09 | $22.41 | $246.50 | |
Demolition | $224.09 | $22.41 | $246.50 |
Hornsby Shire Council | Planning and Building | Building Services | Construction Certificates | Building Class 2 to 9 Structures
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Multi-Unit Housing |
By quotation
|
|||
Commercial |
By quotation
|
|||
Industrial |
By quotation
|
Hornsby Shire Council | Planning and Building | Building Services | Building Information Certificate (BIC) Applications | (Division 6.7)
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Buildings (Unauthorised) |
By quotation
|
|||
Where a development consent, complying development certificate or construction certificate was required for the erection of the building and no such consent or certificate was obtained. The fee payable is the total of the maximum fee payable for development consent, or a complying development certificate and the maximum fee payable for a construction certificate |
Hornsby Shire Council | Planning and Building | Strategic Planning Services | Amendment of Environmental Planning Instrument
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Major Rezoning (Planning Proposal) that would facilitate development with a potential construction value greater than $20 Million. | $69,380.00 | $0.00 | $69,380.00 |
Hornsby Shire Council | Regulatory Services | Environmental Protection | Environmental Compliance
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Out of Hours Construction Applications | $1,498.00 | $0.00 | $1,498.00 | |
Out of hours construction application for building works occurring outside of approved hours. One application required for each period of 24 hours in which out of hours working is to be conducted. |
Hornsby Shire Council | Regulatory Services | Assessment/Review of Construction, Environmental or Traffic Management Plans
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
i) Non-complex Management Plan, generally of the type associated with single residential construction. | $142.00 | $0.00 | $142.00 | |
ii) Moderately complex Management Plans, generally of the type associated with residential flat buildings, commercial and industrial buildings within industrial and medium density zones. | $533.00 | $0.00 | $533.00 | |
iii) Complex Management Plans, generally of the type associated large development sites, and may have significant environmental constraints, and /or contamination issues. | $2,484.00 | $0.00 | $2,484.00 | |
iv) Review of an Approved Management Plan. |
50% of the original fee
|
Hornsby Shire Council | Recreation | Parks and Ovals | Miscellaneous – Parks and Ovals
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Construction access fee around oval/reserve (in addition to bond) per day | $162.73 | $16.27 | $179.00 |