Online Search Facility
64 Fees & Charges Show tree view
Hornsby Shire Council | Construction | 1. Gutter Crossings – Pipe crossings, including pipes up to 375mm diameter and headwalls
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
a. Crossings up to 4.8m long | $1,954.55 | $195.45 | $2,150.00 | |
b. Each additional 1.2 m or part to maximum 9.6m | $390.00 | $39.00 | $429.00 |
Hornsby Shire Council | Construction | 2. Vehicular Crossings – Concrete (excluding layback) | Residential gateways up to 2.5m wide and gutter width up to 3.5m clear width at kerb (125mm thick with F62 mesh)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
a. Distance between boundary and kerb 3.5m | $2,450.00 | $245.00 | $2,695.00 | |
b. Distance between boundary and kerb 4m | $2,900.00 | $290.00 | $3,190.00 | |
c. Distance between boundary and kerb 4.5m | $3,345.45 | $334.55 | $3,680.00 | |
d. Distance between boundary and kerb 5.5m | $4,236.36 | $423.64 | $4,660.00 |
Hornsby Shire Council | Construction | 2. Vehicular Crossings – Concrete (excluding layback) | Residential gateways up to 2.5m wide and gutter width up to 3.5m clear width at kerb (125mm thick with F62 mesh) in conjunction with Hornsby Council road upgrade project
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
e. Distance between boundary and kerb 3.5m | $2,105.45 | $210.55 | $2,316.00 | |
f. Distance between boundary and kerb 4m | $2,555.45 | $255.55 | $2,811.00 | |
g. Distance between boundary and kerb 4.5m | $3,000.91 | $300.09 | $3,301.00 | |
h. Distance between boundary and kerb 5.5m | $3,891.82 | $389.18 | $4,281.00 |
Hornsby Shire Council | Construction | 2. Vehicular Crossings – Concrete (excluding layback) | Over 5.5m (due to design requirements charge as 5.5m crossing) (gate width in excess of 3.5m to be charged at normal crossing rate)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
i. The area of concrete in addition to above to be charged for at rate per square metre: | $299.09 | $29.91 | $329.00 | |
j. Heavy Duty (150mm thick and reinforced with F62) | $328.18 | $32.82 | $361.00 | |
k. Commercial and industrial crossings (200mm thick and reinforced) with two (2) layers of F72) | $428.18 | $42.82 | $471.00 |
Hornsby Shire Council | Construction | 3. Laybacks
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
a. Cut and turn kerb only (4.5m overall length) incl. saw cut | $1,354.55 | $135.45 | $1,490.00 | |
b. Each additional metre | $215.00 | $21.50 | $236.50 | |
c. Cut and turn kerb in conjunction with crossover (4.5 m overall length) | $972.73 | $97.27 | $1,070.00 | |
d. Each additional metre | $174.09 | $17.41 | $191.50 | |
e. Provide layback only (4.5m overall length) | $1,872.73 | $187.27 | $2,060.00 | |
f. Each additional metre | $322.73 | $32.27 | $355.00 | |
g. Provide layback in conjunction with crossover (4.5m overall length) | $1,445.45 | $144.55 | $1,590.00 | |
h. Each additional metre | $270.91 | $27.09 | $298.00 |
Hornsby Shire Council | Construction | 4. Adjusting Utility Services
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
a. Adjusting Utility Services in conjunction with vehicular crossing construction |
At cost + 10%
|
Hornsby Shire Council | Construction | 5. Concrete Sawing
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
a. Concrete sawing in conjunction with vehicular crossing construction |
At cost + 10%
|
Hornsby Shire Council | Construction | 6. Miscellaneous – Construction
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
a. Provide 100mm thick concrete slab to support pavers (allowing for extra excavation) – per sq.m | $241.82 | $24.18 | $266.00 | |
b. Pipe headwalls (where constructed separately) – each | $257.73 | $25.77 | $283.50 | |
c. Asphalt seal (30mm thick) where existing base is suitable – per sq.m | $60.00 | $6.00 | $66.00 | |
d. Provision of base course of 150mm road base material – per sq.m | $124.09 | $12.41 | $136.50 | |
e. Asphalt seal + provision of base course – per sq.m | $183.64 | $18.36 | $202.00 | |
f. Footpath paving 80mm thick – per sq.m | $195.00 | $19.50 | $214.50 | |
g. Kerbing and guttering – 150mm kerb – per lin.m | $370.91 | $37.09 | $408.00 | |
h. Adjustments to 100mm diameter stormwater pipes – min charge/metre | $90.45 | $9.05 | $99.50 | |
i. Fee for supply of plans and supervision of crossings for construction by private contractor | $387.00 | $0.00 | $387.00 | |
Paving requires an additional inspection*
|
||||
j. Fee for supervision of crossing where levels have previously been provided | $193.50 | $0.00 | $193.50 | |
k. Fee for supply of vehicular crossing design levels for the purpose of ensuring correct matching of levels at boundary | $193.50 | $0.00 | $193.50 | |
l. Fee for supervision of crossing construction by Council’s contractor (includes issue of levels) | $387.00 | $0.00 | $387.00 | |
m. Additional inspections regarding * above or where otherwise required – each | $125.50 | $0.00 | $125.50 |
Hornsby Shire Council | Construction | 6. Miscellaneous – Construction | Authorised contractors – vehicular crossings
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
n. Registration Fee | $440.00 | $0.00 | $440.00 | |
o. Annual Fee | $220.00 | $0.00 | $220.00 |
Hornsby Shire Council | Construction | 7. Tender Documents
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
a. Paper copy | $300.00 | $0.00 | $300.00 | |
b. CD copy | $120.00 | $0.00 | $120.00 | |
c. Electronic – via Tenderlink | $0.00 | $0.00 | $0.00 |
Hornsby Shire Council | Planning and Building | Development Services | Development Application | “Specified” Development
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Dwelling-house with an est. construction cost of $100,000 or less (Clause 247) | $455.00 | $0.00 | $455.00 |
Hornsby Shire Council | Planning and Building | Development Services | Modification of a Development Consent – Local development or State significant development (Clause 258) | Section 4.55 (2) of the Act, or under section 4.56 (1) | If the fee for the original application was $100 or more:
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
If the fee for the original application was $100 or more: if the development application involves the erection of a dwelling-house with an est. cost of construction of $100,000 or less | $190.00 | $0.00 | $190.00 | |
Maximum fee payable
|
Hornsby Shire Council | Planning and Building | Development Services | Modification of a Development Consent – Local development or State significant development (Clause 258) | Table D
Any other development application as set out in the Table D as follows:
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Approval to work outside the Hours of Construction stipulated in a development consent – For each event | $2,075.00 | $0.00 | $2,075.00 | |
Maximum fee payable
|
Hornsby Shire Council | Planning and Building | Development Services | Review of a Determination | Review of a DA – (Clause 257)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
In the case of a request that involves the erection of a dwelling-house with an est. cost of construction of $100,000 or less, $190 | $190.00 | $0.00 | $190.00 |
Hornsby Shire Council | Planning and Building | Development Services | Miscellaneous Fees | Registration with Council of Part 4A Certificates by Private Certifiers – Clause 263(2)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
A construction certificate, or | $37.00 | $0.00 | $37.00 |
Hornsby Shire Council | Planning and Building | Building Services | Construction Certificates | Building Class 1 and 10 Structures
By Quotation OR
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Granny Flat | $442.73 | $44.27 | $487.00 | |
Dwelling-house | $558.18 | $55.82 | $614.00 | |
Alterations and additions | $259.09 | $25.91 | $285.00 | |
Swimming pool | $175.45 | $17.55 | $193.00 | |
Shed or garage | $175.45 | $17.55 | $193.00 | |
Minor Structure (decks, carports, retaining walls) | $175.45 | $17.55 | $193.00 | |
Demolition | $175.45 | $17.55 | $193.00 |
Hornsby Shire Council | Planning and Building | Building Services | Construction Certificates | Building Class 2 to 9 Structures
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Multi-Unit Housing |
By quotation
|
|||
Commercial |
By quotation
|
|||
Industrial |
By quotation
|
Hornsby Shire Council | Planning and Building | Building Services | Building Information Certificate Applications – (Division 6.7) | Table E | Floor area of building or part
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Additional inspection fee for the issue of the certificate | $90.00 | $0.00 | $90.00 | |
An additional fee where a development consent, complying development certificate or construction certificate was required for the erection of the building and no such consent or certificate was obtained. The additional fee payable is the total of the maximum fee payable for development consent, or a complying development certificate and the maximum fee payable for a construction certificate
|
Hornsby Shire Council | Planning and Building | Subdivision Services | Subdivision Certificate – Linen Release | Torrens Title | Lodgement Fee for Subdivision Certificate – per lot:
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Inspection fee for Principal Certifying Authority when Council did not issue construction certificate and/or compliance certificates – Fee per hour or part thereof | $188.50 | $0.00 | $188.50 |
Hornsby Shire Council | Planning and Building | Strategic Planning Services | Amendment of Environmental Planning Instrument
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Major Rezoning (Planning Proposal) that would facilitate development with a potential construction value greater than $20 Million. | $62,670.00 | $0.00 | $62,670.00 |
Hornsby Shire Council | Recreation | Parks and Ovals | Miscellaneous – Parks and Ovals
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Construction access fee around oval/reserve (in addition to bond) per day | $146.36 | $14.64 | $161.00 |
Hornsby Shire Council | Regulatory Services | Assessment/Review of Construction, Environmental or Traffic Management Plans
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
iv) Review of an Approved Management Plan. |
50% of the original fee
|
|||
i) Non-complex Management Plan, generally of the type associated with single residential construction. | $140.00 | $0.00 | $140.00 | |
iii) Complex Management Plans, generally of the type associated large development sites, and may have significant environmental constraints, and /or contamination issues. | $2,449.00 | $0.00 | $2,449.00 | |
ii) Moderately complex Management Plans, generally of the type associated with residential flat buildings, commercial and industrial buildings within industrial and medium density zones. | $525.00 | $0.00 | $525.00 |