Online Search Facility
195 Fees & Charges Show tree view
Hornsby Shire Council | Planning and Building | Development Services | Pre-Lodgement
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
All fees include minute preparation and travel to and from the site – Fee per hour or part thereof – Minimum fee 2 hours | $175.91 | $17.59 | $193.50 |
Hornsby Shire Council | Planning and Building | Development Services | Development Application | Table A
All development that is not separately specified and having an estimated cost within the range specified in the Table A as follows (Clause 246B):
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Up to $5,000 | $110.00 | $0.00 | $110.00 | |
Maximum fee payable
|
||||
$5,001 – $50,000 |
$170.00, plus an addnl. $3.00 for each $1,000 (or part of $1,000) of the est. cost
|
|||
Maximum fee payable
|
||||
$50,001 – $250,000 |
$352.00, plus an addnl. $3.64 for each $1,000 (or part of $1,000) by which the est. cost exceeds $50,000
|
|||
Maximum fee payable
|
||||
$250,001 – $500,000 |
$1,160.00, plus an addnl. $2.34 for each $1,000 (or part of $1,000) by which the est. cost exceeds $250,000
|
|||
Maximum fee payable
|
||||
$500,001 – $1,000,000 |
$1,745.00, plus an addnl. $1.64 for each $1,000 (or part of $1,000) by which the est. cost exceeds $500,000
|
|||
Maximum fee payable
|
||||
$1,000,001 – $10,000,000 |
$2,615.00, plus an addnl. $1.44 for each $1,000 (or part of $1,000) by which the est. cost exceeds $1,000,000
|
|||
Maximum fee payable
|
||||
More than $10,000,000 |
$15,875.00, plus an addnl. $1.19 for each $1,000 (or part of $1,000) by which the est. cost exceeds $10,000,000
|
|||
Maximum fee payable
|
Hornsby Shire Council | Planning and Building | Development Services | Development Application | “Specified” Development
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Dwelling-house with an est. construction cost of $100,000 or less (Clause 247) | $455.00 | $0.00 | $455.00 | |
Residential flat building – (Clause 248) | $3,000.00 | $0.00 | $3,000.00 | |
An additional fee, not exceeding $3000, is payable for development which is required to be referred to a design review panel for advice.
|
Hornsby Shire Council | Planning and Building | Development Services | Development Application | “Specified” Development | Advertisements – (advertising signs) – Clause 246B
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
$285, plus $93 for each advertisement in excess of one | $285.00 | $0.00 | $285.00 | |
Or the fee calculated in accordance with the Table A, whichever is the greater
|
||||
Each additional sign | $93.00 | $0.00 | $93.00 |
Hornsby Shire Council | Planning and Building | Development Services | Development Application | Table B | Subdivision involving – (Clause 249)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Opening of a public road | $665.00 | $0.00 | $665.00 | |
Opening of a public road – Each additional lot created | $65.00 | $0.00 | $65.00 | |
No opening of a public road | $330.00 | $0.00 | $330.00 | |
No opening of a public road – Each additional lot created | $53.00 | $0.00 | $53.00 | |
Strata | $330.00 | $0.00 | $330.00 | |
Strata – Each additional lot created | $65.00 | $0.00 | $65.00 | |
Activity – change of use, home occupation/industry – (Clause 250) | $285.00 | $0.00 | $285.00 |
Hornsby Shire Council | Planning and Building | Development Services | Development Application | Table B | Designated development – (Clause 251)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
As per Development Application Table (A) plus $920.00 | $920.00 | $0.00 | $920.00 |
Hornsby Shire Council | Planning and Building | Development Services | Modification of a Development Consent – Local development or State significant development (Clause 258)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Section 4.55 (1) of the Act | $71.00 | $0.00 | $71.00 | |
Maximum fee payable
|
||||
Section 4.55 (1A) of the Act, or under section 4.56 (1), | $645.00 | $0.00 | $645.00 | |
Or 50 percent of the fee for the original development application, whichever is the lesser
Maximum fee payable
|
Hornsby Shire Council | Planning and Building | Development Services | Modification of a Development Consent – Local development or State significant development (Clause 258) | Section 4.55 (2) of the Act, or under section 4.56 (1)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
If the fee for the original application was less than $100 |
50% of original development application fee
|
|||
Maximum fee payable
|
Hornsby Shire Council | Planning and Building | Development Services | Modification of a Development Consent – Local development or State significant development (Clause 258) | Section 4.55 (2) of the Act, or under section 4.56 (1) | If the fee for the original application was $100 or more:
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
If the development application that does not involve the erection of a building, the carrying out of a work or the demolition of a work or building |
50% of original development application fee
|
|||
Maximum fee payable
|
||||
If the fee for the original application was $100 or more: if the development application involves the erection of a dwelling-house with an est. cost of construction of $100,000 or less | $190.00 | $0.00 | $190.00 | |
Maximum fee payable
|
Hornsby Shire Council | Planning and Building | Development Services | Modification of a Development Consent – Local development or State significant development (Clause 258) | Table D
Any other development application as set out in the Table D as follows:
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Up to $5,000 | $55.00 | $0.00 | $55.00 | |
Maximum fee payable
|
||||
$5,001 – $250,000 |
$85.00, plus an addnl. $1.50 for each $1,000 (or part of $1,000) of the est. cost
|
|||
Maximum fee payable
|
||||
$250,001 – $500,000 |
$500.00, plus an addnl. $0.85 for each $1,000 (or part of $1,000) by which the est. cost exceeds $250,000
|
|||
Maximum fee payable
|
||||
$500,001 – $1,000,000 |
$712.00, plus an addnl. $0.50 for each $1,000 (or part of $1,000) by which the est. cost exceeds $500,000
|
|||
Maximum fee payable
|
||||
$1,000,001 – $10,000,000 |
$987.00, plus an addnl. $0.40 for each $1,000 (or part of $1,000) by which the est. cost exceeds $1,000,000
|
|||
Maximum fee payable
|
||||
More than $10,000,000 |
$4,737.00, plus an addnl. $0.27 for each $1,000 (or part of $1,000) by which the est. cost exceeds $10,000,000
|
|||
Maximum fee payable
|
||||
Approval to work outside the Hours of Construction stipulated in a development consent – For each event | $2,075.00 | $0.00 | $2,075.00 | |
Maximum fee payable
|
Hornsby Shire Council | Planning and Building | Development Services | Review of a Determination
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Review of modification of consent – (Clause 258A) |
50% of the original fee
|
Hornsby Shire Council | Planning and Building | Development Services | Review of a Determination | Review of a DA – (Clause 257)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
In the case of an application that does not involve the erection of a building, the carrying out of a work or the demolition of a work or building, 50 per cent of the fee for the original development application, and |
50% of original development application fee
|
|||
In the case of a request that involves the erection of a dwelling-house with an est. cost of construction of $100,000 or less, $190 | $190.00 | $0.00 | $190.00 |
Hornsby Shire Council | Planning and Building | Development Services | Review of a Determination | Table C
In the case of a request with respect to any other development application as set out in Table C as follows:
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Up to $5,000 | $55.00 | $0.00 | $55.00 | |
Maximum fee payable
|
||||
$5,001 – $250,000 |
$85.00, plus an addnl. $1.50 for each $1,000 (or part of $1,000) of the est. cost
|
|||
Maximum fee payable
|
||||
$250,001 – $500,000 |
$500.00, plus an addnl. $0.85 for each $1,000 (or part of $1,000) by which the est. cost exceeds $250,000
|
|||
Maximum fee payable
|
||||
$500,001 – $1,000,000 |
$712.00, plus an addnl. $0.50 for each $1,000 (or part of $1,000) by which the est. cost exceeds $500,000
|
|||
Maximum fee payable
|
||||
$1,000,001 – $10,000,000 |
$987.00, plus an addnl. $0.40 for each $1,000 (or part of $1,000) by which the est. cost exceeds $1,000,000
|
|||
Maximum fee payable
|
||||
More than $10,000,000 |
$4,737.00, plus an addnl. $0.27 for each $1,000 (or part of $1,000) by which the est. cost exceeds $10,000,000
|
|||
Maximum fee payable
|
Hornsby Shire Council | Planning and Building | Development Services | Review of a Determination | Section 8.2 Review where Development Application not accepted – (Clause 257A)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Development is less than $100,000 | $55.00 | $0.00 | $55.00 | |
The development is $100,000 or more and less than or equal to $1,000,000 | $150.00 | $0.00 | $150.00 | |
The development is more than $1,000,000 | $250.00 | $0.00 | $250.00 |
Hornsby Shire Council | Planning and Building | Development Services | Advertising Fee - Local Development
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
DA Advertising Fee |
By quotation
|
Hornsby Shire Council | Planning and Building | Development Services | 252 Additional Fees - Development Requiring Advertising | Additional maximum fee to any other fees payable:
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
In the case of designated development | $2,220.00 | $0.00 | $2,220.00 | |
In the case of advertised development | $1,105.00 | $0.00 | $1,105.00 | |
In the case of prohibited development | $1,105.00 | $0.00 | $1,105.00 | |
In the case of development for which an environmental planning instrument or development control plan requires notice to be given otherwise than as referred to in paragraph (a), (b) or (c) | $1,105.00 | $0.00 | $1,105.00 | |
In the case of development where notice of the application is required to be given under section 4.55 (2) or 4.56 (1) of the Act (Clause 258) | $665.00 | $0.00 | $665.00 | |
In the case of development where notice of the application is required to be given under section 8.2 of the EP&A Act (Clause 258A) |
Hornsby Shire Council | Planning and Building | Development Services | Development that Requires Concurrence of Another Gov't Authority – (clause 252A)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
As per Development Application Table (A) plus $320.00 for each approval body | $320.00 | $0.00 | $320.00 | |
Plus $140.00 Council processing fee | $140.00 | $0.00 | $140.00 |
Hornsby Shire Council | Planning and Building | Development Services | Integrated Development – (Clause 253)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
As per Development Application Table (A) plus $320.00 for each approval body | $320.00 | $0.00 | $320.00 | |
Plus $140.00 Council processing fee | $140.00 | $0.00 | $140.00 |
Hornsby Shire Council | Planning and Building | Development Services | Design Excellence Panel
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Administation Fee - per meeting - Non refunderable - paid on booking | $360.00 | $0.00 | $360.00 |
Hornsby Shire Council | Planning and Building | Development Services | Design Excellence Panel | Design Excellence Panel - Professional fees - initial consideration
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
i) 3 storeys or less | $1,656.00 | $0.00 | $1,656.00 | |
ii) more than 3 storeys | $3,000.00 | $0.00 | $3,000.00 |
Hornsby Shire Council | Planning and Building | Development Services | Design Excellence Panel | Subsequent referrals for developments
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
i) 3 storeys or less | $580.00 | $0.00 | $580.00 | |
ii) more than 3 storeys | $1,162.00 | $0.00 | $1,162.00 |
Hornsby Shire Council | Planning and Building | Development Services | Amended Application Plans
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Amended Application Plans |
50% of original application fee or $180 which ever is greater
|
Hornsby Shire Council | Planning and Building | Development Services | Extension of Consent Period – Clause 4.54
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Extension of Consent Period – Clause 4.54 | $392.00 | $0.00 | $392.00 |
Hornsby Shire Council | Planning and Building | Development Services | Developer Contributions – Sections 7.11 & 7.12
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Developer Contributions – Section 7.11 & 7.12 |
Payment of Contributions as described in Council’s Section 7.11 and s7.12 Plan
|
Hornsby Shire Council | Planning and Building | Development Services | Other Approvals and Permits, including S.68 of the Local Government Act 1993
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Install a manufactured home, moveable dwelling or associated structure on land |
As per DA & building services fees
|
|||
Install a domestic/oil or solid heating appliance |
As per DA & building services fees
|
|||
Operate a caravan park or camping ground – Approval to operate – per site | $7.50 | $0.00 | $7.50 | |
Operate a manufactured home estate – per site | $7.50 | $0.00 | $7.50 | |
Connect private stormwater system into Council’s piped stormwater drainage system | $467.00 | $0.00 | $467.00 | |
Mobile Food Vendor – Application for Approval to Operate | $193.50 | $0.00 | $193.50 |
Hornsby Shire Council | Planning and Building | Development Services | NSW Government Planning Reform Fee – (Clause 256L)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
For each development application having an est. cost exceeding $50,000, an amount calculated as follows is to be set aside for payment to the Director-General. |
0.64xE
P = _______ – 5
1,000.00
|
Hornsby Shire Council | Planning and Building | Development Services | Miscellaneous Fees
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Written reply to letters of enquiry regarding development consent and other matters | $193.50 | $0.00 | $193.50 |
Hornsby Shire Council | Planning and Building | Development Services | Miscellaneous Fees | Application Lodgement – Per Application Type
Amended Plans/Additional Information
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Minor Development ($0 to $300,000) | $57.00 | $0.00 | $57.00 | |
Medium Development ($300,001 to $900,000) | $132.50 | $0.00 | $132.50 | |
Large Development ($900,001 to $10,000,000) | $277.00 | $0.00 | $277.00 | |
Extra Large Development (more than $10,000,000) |
By quotation
|
Hornsby Shire Council | Planning and Building | Development Services | Miscellaneous Fees | Registration with Council of Part 4A Certificates by Private Certifiers – Clause 263(2)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
A complying development certificate | $37.00 | $0.00 | $37.00 | |
A construction certificate, or | $37.00 | $0.00 | $37.00 | |
An occupation certificate, or | $37.00 | $0.00 | $37.00 | |
A subdivision certificate | $37.00 | $0.00 | $37.00 |
Hornsby Shire Council | Planning and Building | Development Services | Bonds and Levies | Footpath / Road and Kerb & Gutter Damage Inspections levy – Non Refundable
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Total cost of works under $15,000 |
No fee
|
|||
BCA Class 1 & 10 | $156.50 | $0.00 | $156.50 | |
BCA Class 2 to 9 – except for Residential Flat Buildings | $1,045.50 | $0.00 | $1,045.50 | |
Class 2 Residential Flat Buildings | $4,182.00 | $0.00 | $4,182.00 |
Hornsby Shire Council | Planning and Building | Development Services | Services
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Fee for services pursuant to s608 Local Government Act | $293.00 | $0.00 | $293.00 |
Hornsby Shire Council | Planning and Building | Development Services | Regulatory | Compliance Levy
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Development Compliance Levy - payable for all development consents |
0.1% of Capital Investment (CIV) of development, minimum levy of $100 per development application
|
Hornsby Shire Council | Planning and Building | Building Services | Construction Certificates | Building Class 1 and 10 Structures
By Quotation OR
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Granny Flat | $442.73 | $44.27 | $487.00 | |
Dwelling-house | $558.18 | $55.82 | $614.00 | |
Alterations and additions | $259.09 | $25.91 | $285.00 | |
Swimming pool | $175.45 | $17.55 | $193.00 | |
Shed or garage | $175.45 | $17.55 | $193.00 | |
Minor Structure (decks, carports, retaining walls) | $175.45 | $17.55 | $193.00 | |
Demolition | $175.45 | $17.55 | $193.00 |
Hornsby Shire Council | Planning and Building | Building Services | Construction Certificates | Building Class 2 to 9 Structures
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Multi-Unit Housing |
By quotation
|
|||
Commercial |
By quotation
|
|||
Industrial |
By quotation
|
Hornsby Shire Council | Planning and Building | Building Services | Complying Development Certificates | General Housing Code
By Quotation OR
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Granny Flats | $987.27 | $98.73 | $1,086.00 | |
Dwelling-house | $1,334.55 | $133.45 | $1,468.00 | |
Alterations and Additions | $682.73 | $68.27 | $751.00 | |
Swimming pools | $513.64 | $51.36 | $565.00 | |
Sheds and garages | $683.64 | $68.36 | $752.00 | |
Minor Structures (decks, carports, retaining walls) | $513.64 | $51.36 | $565.00 | |
Demolition | $345.45 | $34.55 | $380.00 |
Hornsby Shire Council | Planning and Building | Building Services | Complying Development Certificates | General Commercial & Industrial Code
By Quotation OR
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Building Alterations (internal) | $777.27 | $77.73 | $855.00 | |
Change of Building Use | $777.27 | $77.73 | $855.00 | |
Shop fronts and awning alterations | $777.27 | $77.73 | $855.00 | |
Mechanical ventilation | $777.27 | $77.73 | $855.00 | |
Commercial & Industrial Code |
By quotation
|
Hornsby Shire Council | Planning and Building | Building Services | Mandatory Building Inspections | Building Class 1 and 10 Structures and Appointment of HSC as Principal Certifying Authority (PCA)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Appointment of HSC as PCA (plus inspection fees) | $227.27 | $22.73 | $250.00 | |
Appointment of HSC as Replacement (PCA) (plus inspection fees) | $772.73 | $77.27 | $850.00 | |
Granny Flat | $701.82 | $70.18 | $772.00 | |
Dwelling-house | $877.27 | $87.73 | $965.00 | |
Alterations and Additions | $701.82 | $70.18 | $772.00 | |
Swimming pool | $526.36 | $52.64 | $579.00 | |
Sheds and garages | $526.36 | $52.64 | $579.00 | |
Minor Structures (decks, carports, retaining walls) | $526.36 | $52.64 | $579.00 |
Hornsby Shire Council | Planning and Building | Building Services | Mandatory Building Inspections | Building Class 2 to 9 Structures and Appointment of HSC as Principal Certifying Authority (PCA)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Appointment of HSC as PCA (plus inspection fees) | $227.27 | $22.73 | $250.00 | |
Appointment of HSC as Replacement (PCA) (plus inspections) | $772.73 | $77.27 | $850.00 | |
Multi-Unit Housing |
By quotation
|
|||
Commercial |
By quotation
|
|||
Industrial |
By quotation
|
Hornsby Shire Council | Planning and Building | Building Services | Occupation Certificates – Final – Where Council is the PC
Prior to using or occupying a new structure you must obtain an Occupation Certificate. This certificate authorises:
(a) The occupation and use of a new building; (b) A change of building use for an existing building
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Fee | $175.45 | $17.55 | $193.00 |
Hornsby Shire Council | Planning and Building | Building Services | Building Information Certificate Applications – (Division 6.7)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Class 1 building (together with any class 10 buildings on the site) or a class 10 building, $250 for each dwelling contained in the building or in any other building on the allotment, or |
Class 1 building (together with any class 10 buildings on the site) or a class 10 building, $250 for each dwelling contained in the building or in any other building on the allotment, or
|
Hornsby Shire Council | Planning and Building | Building Services | Building Information Certificate Applications – (Division 6.7) | Table E | Floor area of building or part
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Not exceeding 200 square metres | $250.00 | $0.00 | $250.00 | |
Exceeding 200 square metres but not exceeding 2,000 square metres | $250.00 | $0.00 | $250.00 | |
If over 200 square metres, Plus |
0.50 cents each sq/m over 200 sq/m
|
|||
Exceeding 2,000 square metres, Plus | $1,165.00 | $0.00 | $1,165.00 | |
If over 2,000 square metres, Plus |
0.075 cents each sq/m over 2,000 sq/m
|
|||
In any case where the application relates to a part of a building and that part consists of an external wall only or does not otherwise have a floor area, $250 | $250.00 | $0.00 | $250.00 | |
Additional inspection fee for the issue of the certificate | $90.00 | $0.00 | $90.00 | |
An additional fee where a development consent, complying development certificate or construction certificate was required for the erection of the building and no such consent or certificate was obtained. The additional fee payable is the total of the maximum fee payable for development consent, or a complying development certificate and the maximum fee payable for a construction certificate
|
||||
Section 6.23 Building Certificate – Urgency Fee (additional to statutory fee) – certificate issued within 2 (two) working days of receipt of application | $616.00 | $0.00 | $616.00 |
Hornsby Shire Council | Planning and Building | Building Services | Swimming Pools | Swimming Pool Exemption Applications
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Exemption Under Section 22 of the Swimming Pools Act, 1992 | $73.50 | $0.00 | $73.50 |
Hornsby Shire Council | Planning and Building | Building Services | Swimming Pools | Swimming Pool Certificate of Compliance Applications – Section 24 of the Swimming Pools Act, 1992
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Initial Swimming Pool Barrier Inspection | $150.00 | $15.00 | $165.00 | |
Statutory fee
|
||||
Subsequent Swimming Pool Barrier Inspection | $100.00 | $10.00 | $110.00 | |
Statutory fee
|
Hornsby Shire Council | Planning and Building | Building Services | Miscellaneous Building Services Fees
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Annual Fire Safety Statement Registration Fee | $120.91 | $12.09 | $133.00 | |
Bushfire Attack Level Advice (s 4.14) | $409.09 | $40.91 | $450.00 | |
Principal Certifying Authority Signs | $9.45 | $0.95 | $10.40 | |
Building Certifications – Hourly Rate | $193.00 | $0.00 | $193.00 | |
You might need a service that we do not cover in this price sheet. If you do, we will charge you an hourly rate for the service
|
Hornsby Shire Council | Planning and Building | Subdivision Services | Subdivision Works Certificates
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Roadworks, public pathway, drainage works, interallotment drainage, on-site detention system, right of way and access driveway, etc. – Fee per hour or part thereof. (Quotation to be obtained from Council) |
By quotation only
|
Hornsby Shire Council | Planning and Building | Subdivision Services | Inspections
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
For roadworks, public pathway, drainage works, interallotment drainage, on-site detention system, right of way and access driveway – Fee per hour or part thereof – minimum fee (Quotation to be obtained from Council prior to commencement of work) |
By quotation only
|
|||
Inspection fee for second and subsequent inspections of the same work – per inspection | $207.50 | $0.00 | $207.50 | |
In all cases where defective road pavements are detected a charge per test will be made to the subdivider – Fee per hour or part thereof | $207.50 | $0.00 | $207.50 |
Hornsby Shire Council | Planning and Building | Subdivision Services | Bonding of Works
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Application fee for bonding of works below $2,500 | $364.00 | $0.00 | $364.00 | |
Application fee for bonding of works over $2,500 | $620.00 | $0.00 | $620.00 | |
Release or partial release of bond | $364.00 | $0.00 | $364.00 |
Hornsby Shire Council | Planning and Building | Subdivision Services | Subdivision Certificate – Linen Release | Torrens Title | Lodgement Fee for Subdivision Certificate – per lot:
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
1-10 lots – Fee per lot | $570.00 | $0.00 | $570.00 | |
11 lots and above – Fee per lot | $529.00 | $0.00 | $529.00 | |
Inspection fee for Principal Certifying Authority when Council did not issue construction certificate and/or compliance certificates – Fee per hour or part thereof | $188.50 | $0.00 | $188.50 |
Hornsby Shire Council | Planning and Building | Subdivision Services | Subdivision Certificate – Linen Release | Strata Plan Applications – (s37 of the Strata Schemes Act)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Strata Plan Application Fees |
By quotation
|
Hornsby Shire Council | Planning and Building | Subdivision Services | Miscellaneous Items – Subdivision
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Stormwater Drainage/Detention Volume & Flow Rates Enquiry | $259.00 | $0.00 | $259.00 | |
Application for a house number and/or re-numbering | $259.50 | $0.00 | $259.50 | |
Application for naming of a street | $2,305.00 | $0.00 | $2,305.00 |
Hornsby Shire Council | Planning and Building | Subdivision Services | Miscellaneous Items – Subdivision | Execution of legal documents
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Endorsement by General Manager/Authorised Officer | $420.00 | $0.00 | $420.00 | |
Release or variation of restriction | $334.00 | $0.00 | $334.00 |
Hornsby Shire Council | Planning and Building | Strategic Planning Services | Planning Certificates – (Clause 259, EP&A Regulation)
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Planning Certificate – the prescribed fee for the issue of a certificate under section 10.7 (2) of the Act is $53 | $53.00 | $0.00 | $53.00 | |
A council may charge one additional fee of not more than $80 for any advice given under section 10.7 (5) of the Act | $80.00 | $0.00 | $80.00 |
Hornsby Shire Council | Planning and Building | Strategic Planning Services | Amendment of Environmental Planning Instrument
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Pre Planning Proposal Lodgement Meeting Fee | $1,090.91 | $109.09 | $1,200.00 | |
Minor Rezoning (Planning Proposal) | $31,335.00 | $0.00 | $31,335.00 | |
Major Rezoning (Planning Proposal) that would facilitate development with a potential construction value greater than $20 Million. | $62,670.00 | $0.00 | $62,670.00 | |
Reclassification – public hearing fee |
Full cost recovery
|
|||
Fees for external consultants to peer review additional studies post Gateway Review approval |
Full cost recovery
|
|||
Fees for amendment to the existing DCP | $4,185.00 | $0.00 | $4,185.00 | |
Fees for amendment to the existing DCP requiring the engagement of external consultants (which may include the preparation of a site specific masterplan, DCP part or change to figures) |
Full cost recovery
|
Hornsby Shire Council | Planning and Building | Strategic Planning Services | Voluntary Planning Agreements
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Preparation / Legal Review |
Full cost recovery
|
|||
Advertising |
Full cost recovery
|
Hornsby Shire Council | Planning and Building | Strategic Planning Services | Miscellaneous Items – Strategic Planning
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Sale of publications – various prices – minimum per document | $19.50 | $0.00 | $19.50 |
Hornsby Shire Council | Planning and Building | Strategic Planning Services | Miscellaneous Items – Strategic Planning | LEPS, LEP MAPS, DCPS & Study Sales
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Hornsby Local Environmental Plan – Hard Copy (excluding maps – supporting maps available for viewing at www.legislation.nsw.gov.au) | $110.50 | $0.00 | $110.50 | |
Hornsby Local Environmental Plan – Compact Disc (excluding maps – supporting maps available for viewing at www.legislation.nsw.gov.au) | $41.00 | $0.00 | $41.00 | |
Hornsby Local Environmental Plan Explanatory Notes – Hard Copy | $110.50 | $0.00 | $110.50 | |
Hornsby Local Environmental Plan Explanatory Notes – Compact Disc | $41.00 | $0.00 | $41.00 | |
Hornsby Development Control Plan (Supplement to LEP) – All Parts only where hard copy is available | $292.00 | $0.00 | $292.00 | |
Hornsby Development Control Plan (Supplement to LEP) – Each Part only where hard copy is available | $30.00 | $0.00 | $30.00 | |
Hornsby Development Control Plan – Compact Disc | $41.00 | $0.00 | $41.00 | |
Planning Studies – Hard Copy (per volume) | $110.50 | $0.00 | $110.50 | |
Planning Studies – Compact Disc – where available | $41.00 | $0.00 | $41.00 |
Hornsby Shire Council | Planning and Building | Strategic Planning Services | Miscellaneous Items – Strategic Planning | Map and Publication Sales
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
The prescribed fee for a certified copy of a document, map or plan referred to in section 10.8 (2) of the Act is $53 (Clause 262, EP&A Regulation) | $53.00 | $0.00 | $53.00 |
Hornsby Shire Council | Planning and Building | Strategic Planning Services | Miscellaneous Items – Strategic Planning | Map and Publication Sales | GIS Enquiry Print Black/White – sizes as follows:
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
A4 | $27.00 | $0.00 | $27.00 | |
A3 | $31.00 | $0.00 | $31.00 | |
A2 | $36.00 | $0.00 | $36.00 | |
A1 | $45.50 | $0.00 | $45.50 | |
A0 | $58.00 | $0.00 | $58.00 |
Hornsby Shire Council | Planning and Building | Strategic Planning Services | Miscellaneous Items – Strategic Planning | Map and Publication Sales | Zone Colour Maps – sizes as follows:
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
A4 | $36.00 | $0.00 | $36.00 | |
A3 | $40.00 | $0.00 | $40.00 | |
A2 | $50.50 | $0.00 | $50.50 | |
A1 | $71.50 | $0.00 | $71.50 | |
A0 | $96.50 | $0.00 | $96.50 |
Hornsby Shire Council | Planning and Building | Strategic Planning Services | Miscellaneous Services
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
Professional/technical advice – Hourly Rate | $193.50 | $0.00 | $193.50 | |
You might need a service that we don’t cover in this price sheet. If you do, we will charge you an hourly rate for the service
|
Hornsby Shire Council | Planning and Building | Strategic Planning Services | Miscellaneous Services | Photocopy service for plans and documents – Charge per copy:
Name |
2020/2021 Fee (excl. GST) |
2020/2021 GST |
2020/2021 Fee (incl. GST) |
|
AO Size (841mm x 1,189mm) | $15.10 | $0.00 | $15.10 | |
A1 Size (594mm x 841mm) | $14.10 | $0.00 | $14.10 | |
A2 Size (420mm x 594mm) | $13.85 | $0.00 | $13.85 | |
A3 Size (297mm x 420mm) | $4.90 | $0.00 | $4.90 | |
A4 Size (210mm x 297mm) – first 10 pages | $0.00 | $0.00 | $0.00 | |
A4 Size (210mm x 297mm) – 11 pages or more (charged per page from page 1) | $1.60 | $0.00 | $1.60 | |
Reduction of AO & A1 size plan to A3 size plan | $15.30 | $0.00 | $15.30 | |
Total cost to reduce an AO or A1 size plan to A4 size plan | $17.35 | $0.00 | $17.35 | |
Reduction of A3 size plan to A4 size plan | $4.30 | $0.00 | $4.30 |