Online Search Facility
41 Fees & Charges Show tree view
Hornsby Shire Council | Road Openings | Service Authorities and Plumbers/Drainers/Owners/Builders | Roads Only – Class of Opening
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Asphaltic concrete with cement concrete base | $641.00 | $0.00 | $641.00 | |
Cement concrete | $641.00 | $0.00 | $641.00 | |
All asphaltic concrete work on roads other than Main Roads | $375.00 | $0.00 | $375.00 | |
Asphaltic concrete (work on Main Roads) |
Actual Cost
|
|||
Brick pavers |
Actual Cost
|
|||
All bituminous surfaces except in Items | $277.00 | $0.00 | $277.00 | |
Unsealed pavement or shoulders | $164.50 | $0.00 | $164.50 |
Hornsby Shire Council | Road Openings | Service Authorities and Plumbers/Drainers/Owners/Builders | Footpaths – Class of Opening
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Concrete 75mm or 80mm | $315.00 | $0.00 | $315.00 | |
Pram Ramps | $315.00 | $0.00 | $315.00 | |
Concrete 125mm (vehicular crossings) | $389.00 | $0.00 | $389.00 | |
Concrete 150mm or 180mm (heavy duty vehicular crossing) | $465.00 | $0.00 | $465.00 | |
Asphalt | $170.00 | $0.00 | $170.00 | |
Brick pavers |
Actual Cost
|
|||
Earth |
Actual Cost |
|||
Kerbing and guttering (per lineal metre) / Traffic Island | $538.00 | $0.00 | $538.00 | |
Concrete dish gutter for vehicular crossing (per lineal metre) | $539.00 | $0.00 | $539.00 | |
Opening kerb for drain pipe (maximum length 0.5m) | $159.50 | $0.00 | $159.50 | |
Layback (per linear metre) | $538.00 | $0.00 | $538.00 |
Hornsby Shire Council | Road Openings | Service Authorities and Plumbers/Drainers/Owners/Builders | Miscellaneous – Class of Opening
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Kerb inlet and all types of drainage pits at cost |
Actual Cost
|
|||
Headwalls – pipe vehicular crossings |
Actual Cost
|
|||
Permit fee – applicable to all classes of openings (excluding service authorities) | $124.00 | $0.00 | $124.00 | |
TURF (per metre square) | $75.00 | $0.00 | $75.00 | |
Crack sealing (per Linear metre) | $7.00 | $0.00 | $7.00 | |
Driveway Colour per metre square | $166.00 | $0.00 | $166.00 | |
Saw Cutting | $37.00 | $0.00 | $37.00 | |
V Lock | $125.00 | $0.00 | $125.00 | |
Stormwater cap | $319.00 | $0.00 | $319.00 | |
Additional excavation 180mm concrete Drive per sq metre | $132.00 | $0.00 | $132.00 | |
Traffic Control Additional per person per hour | $57.00 | $0.00 | $57.00 | |
Traffic Control DAY RATE per person | $517.00 | $0.00 | $517.00 | |
Tipping per ton | $476.00 | $0.00 | $476.00 | |
Haulage to Tip and unloading per trip | $465.00 | $0.00 | $465.00 | |
Site establishment | $3,100.00 | $0.00 | $3,100.00 | |
Plant opening Fee | $2,585.00 | $0.00 | $2,585.00 | |
Jemena Spotter Fee per hour - MIN 4 hours | $186.00 | $0.00 | $186.00 | |
Rise and Fall adjustment for Tender Rates |
12.5% |
|||
Site Inspection | $175.00 | $0.00 | $175.00 |
Hornsby Shire Council | Road Openings | Service Authorities and Plumbers/Drainers/Owners/Builders | Nightwork
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Footpath per sq metre | $507.00 | $0.00 | $507.00 | |
Vehicular Crossing per sq metre | $558.00 | $0.00 | $558.00 | |
Night Works Surcharge | $0.00 | $0.00 | $0.00 | |
Traffic Control per person - Night Rate | $620.00 | $0.00 | $620.00 |