Online Search Facility
43 Fees & Charges Show tree view
Hornsby Shire Council | Road Openings | Service Authorities and Plumbers/Drainers/Owners/Builders | Roads Only – Class of Opening
|
Name |
2025/2026 Fee (excl. GST) |
2025/2026 GST |
2025/2026 Fee (incl. GST) |
|
| Asphaltic concrete with cement concrete base | $666.00 | $0.00 | $666.00 | |
| Cement concrete | $666.00 | $0.00 | $666.00 | |
| All asphaltic concrete work on roads other than Main Roads | $390.00 | $0.00 | $390.00 | |
| Asphaltic concrete (work on Main Roads) |
Actual Cost
|
|||
| Brick pavers |
Actual Cost
|
|||
| All bituminous surfaces except in Items | $288.00 | $0.00 | $288.00 | |
| Unsealed pavement or shoulders | $171.00 | $0.00 | $171.00 | |
Hornsby Shire Council | Road Openings | Service Authorities and Plumbers/Drainers/Owners/Builders | Footpaths – Class of Opening
|
Name |
2025/2026 Fee (excl. GST) |
2025/2026 GST |
2025/2026 Fee (incl. GST) |
|
| Concrete 75mm or 80mm | $327.00 | $0.00 | $327.00 | |
| Pram Ramps | $327.00 | $0.00 | $327.00 | |
| Concrete 125mm (vehicular crossings) | $404.00 | $0.00 | $404.00 | |
| Concrete 150mm or 180mm (heavy duty vehicular crossing) | $483.00 | $0.00 | $483.00 | |
| Asphalt | $176.50 | $0.00 | $176.50 | |
| Brick pavers |
Actual Cost
|
|||
| Earth |
Actual Cost |
|||
| Kerbing and guttering (per lineal metre) / Traffic Island | $559.00 | $0.00 | $559.00 | |
| Concrete dish gutter for vehicular crossing (per lineal metre) | $560.00 | $0.00 | $560.00 | |
| Opening kerb for drain pipe (maximum length 0.5m) | $166.00 | $0.00 | $166.00 | |
| Layback (per linear metre) | $559.00 | $0.00 | $559.00 | |
Hornsby Shire Council | Road Openings | Service Authorities and Plumbers/Drainers/Owners/Builders | Miscellaneous – Class of Opening
|
Name |
2025/2026 Fee (excl. GST) |
2025/2026 GST |
2025/2026 Fee (incl. GST) |
|
| Kerb inlet and all types of drainage pits at cost |
Actual Cost
|
|||
| Headwalls – pipe vehicular crossings |
Actual Cost
|
|||
| Permit fee – applicable to all classes of openings (excluding service authorities) | $129.00 | $0.00 | $129.00 | |
| TURF (per metre square) | $78.00 | $0.00 | $78.00 | |
| Crack sealing (per Linear metre) | $7.50 | $0.00 | $7.50 | |
| Driveway Colour per metre square | $172.50 | $0.00 | $172.50 | |
| Saw Cutting | $38.50 | $0.00 | $38.50 | |
| V Lock | $130.00 | $0.00 | $130.00 | |
| Stormwater cap | $332.00 | $0.00 | $332.00 | |
| Additional excavation 180mm concrete Drive per sq metre | $137.50 | $0.00 | $137.50 | |
| Traffic Control Additional per person per hour | $59.50 | $0.00 | $59.50 | |
| Traffic Control DAY RATE per person | $537.00 | $0.00 | $537.00 | |
| Traffic Sensor Loops |
Actual Cost |
|||
| Tipping per ton | $495.00 | $0.00 | $495.00 | |
| Haulage to Tip and unloading per trip | $483.00 | $0.00 | $483.00 | |
| Site establishment | $3,220.00 | $0.00 | $3,220.00 | |
| Plant opening Fee | $2,685.00 | $0.00 | $2,685.00 | |
| Jemena Spotter Fee per hour - MIN 4 hours | $193.50 | $0.00 | $193.50 | |
| Rise and Fall adjustment for Tender Rates |
12.5% |
|||
| Site Inspection | $182.00 | $0.00 | $182.00 | |
Hornsby Shire Council | Road Openings | Service Authorities and Plumbers/Drainers/Owners/Builders | Nightwork
|
Name |
2025/2026 Fee (excl. GST) |
2025/2026 GST |
2025/2026 Fee (incl. GST) |
|
| Footpath per sq metre | $527.00 | $0.00 | $527.00 | |
| Vehicular Crossing per sq metre | $580.00 | $0.00 | $580.00 | |
| Night Works Surcharge | $2,595.00 | $0.00 | $2,595.00 | |
| Traffic Control per person - Night Rate | $644.00 | $0.00 | $644.00 | |
| Asphalt Flat Night Rate | $5,037.00 | $0.00 | $5,037.00 |