Planning Certificate 10.7 (Part 2) Fee (within 3-5 working days) | $66.00 | $0.00 | $66.00 | |
Planning Certificate 10.7 (Parts 2 & 5) Fee (within 3-5 working days) | $165.00 | $0.00 | $165.00 | |
Planning Certificates Urgency Fee – (Within 1 working day) | $177.00 | $0.00 | $177.00 |
NORTH SYDNEY COUNCIL | CITY STRATEGY | PLANNING & DEVELOPMENT CERTIFICATES | SECTION 735A & CLAUSE 41 SCHEDULE 5 EP&A ACT CERTIFICATE
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
S735A & Clause 41 Schedule 5 EP&A Act Certificate Fee – (within 3-5 working days) | $142.00 | $0.00 | $142.00 | |
S735A & Clause 41 Schedule 5 EP&A Act Certificate Urgency Fee – (Within 1 working day) | $177.00 | $0.00 | $177.00 |
NORTH SYDNEY COUNCIL | CITY STRATEGY | PLANNING & DEVELOPMENT CERTIFICATES | CONSTRUCTION CERTIFICATE | CONSTRUCTION CERTIFICATE - SINGLE DWELLING AND STRUCTURES ANCILLARY TO BUILDINGS (CLASS 10)
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Construction Certificate Fee – Works less than $5,000.00 | $267.27 | $26.73 | $294.00 | |
Construction Certificate Fee – Works from $5,001.00 to $10,000.00 | $534.55 | $53.45 | $588.00 | |
Construction Certificate Fee – Works from $10,001.00 to $50,000.00 | $1,066.36 | $106.64 | $1,173.00 | |
Construction Certificate Fee – Works from $50,001.00 to $1,000,000.00 | $2,665.45 | $266.55 | $2,932.00 | |
Construction Certificate Fee – Works from $1,000,001.00 to $2,000,000.00 | $3,730.91 | $373.09 | $4,104.00 | |
Construction Certificate Fee – Works greater than $2,000,001.00 |
$4,104.00 plus 0.2% of the value over $2,000,000.00
|
|||
Resubmitted Construction Certificate application (Previously refused by Council) |
50% of original Construction Certificate fee
|
|||
Progress Inspection / Re-inspection fee (Council is the PCA) | $320.91 | $32.09 | $353.00 | |
Administration fee (If critical stage inspection missed) | $320.91 | $32.09 | $353.00 | |
Re-assessment fee (Council not the original PCA) |
50% of Construction Certificate fee as determined by Council
|
|||
Amendment to Construction Certificate |
50% of original construction certificate fee
|
NORTH SYDNEY COUNCIL | CITY STRATEGY | PLANNING & DEVELOPMENT CERTIFICATES | CONSTRUCTION CERTIFICATE | CONSTRUCTION CERTIFICATE - MULTI-OCCUPANCY
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Construction Certificate Fee – Works less than $5,000.00 | $267.27 | $26.73 | $294.00 | |
Construction Certificate Fee – Works from $5,001.00 to $10,000.00 | $534.55 | $53.45 | $588.00 | |
Construction Certificate Fee – Works from $10,001.00 to $50,000.00 | $1,066.36 | $106.64 | $1,173.00 | |
Construction Certificate Fee – Works from $50,001.00 to $1,000,000.00 | $2,665.45 | $266.55 | $2,932.00 | |
Construction Certificate Fee – Works from $1,000,001.00 to $2,000,000.00 | $3,730.91 | $373.09 | $4,104.00 | |
Construction Certificate Fee – Works greater than $2,000,001.00 |
$4,104.00 plus 0.2% of the value over $2,000,000.00
|
|||
Construction Certificate Fee – Per additional dwelling (in addition to applicable fee) | $427.27 | $42.73 | $470.00 | |
Resubmitted Construction Certificate application (Previously refused by Council) |
50% of original Construction Certificate fee
|
|||
Progress Inspection / Re-inspection fee (Council is the PCA) |
$353.00 plus $110.00 per dwelling
|
|||
Administration fee (If critical stage inspection missed) | $320.91 | $32.09 | $353.00 | |
Re-assessment fee (Council not the original PCA) |
50% of Construction Certificate fee as determined by Council
|
|||
Amendment to Construction Certificate |
50% of original construction certificate fee
|
NORTH SYDNEY COUNCIL | CITY STRATEGY | PLANNING & DEVELOPMENT CERTIFICATES | CONSTRUCTION CERTIFICATE | CONSTRUCTION CERTIFICATE - COMMERCIAL / INDUSTRIAL / RETAIL
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Construction Certificate Fee – Works less than $5,000.00 | $267.27 | $26.73 | $294.00 | |
Construction Certificate Fee – Works from $5,001.00 to $10,000.00 | $534.55 | $53.45 | $588.00 | |
Construction Certificate Fee – Works from $10,001.00 to $50,000.00 | $1,066.36 | $106.64 | $1,173.00 | |
Construction Certificate Fee – Works from $50,001.00 to $1,000,000.00 | $2,665.45 | $266.55 | $2,932.00 | |
Construction Certificate Fee – Works from $1,000,001.00 to $2,000,000.00 | $3,730.91 | $373.09 | $4,104.00 | |
Construction Certificate Fee – Works greater than $2,000,001.00 |
$4,104.00 plus 0.2% of the value over $2,000,000.00
|
|||
Construction Certificate Fee – Per 100m2 gross floor area (in addition to applicable fee) | $427.27 | $42.73 | $470.00 | |
Resubmitted Construction Certificate application (Previously refused by Council) |
50% of original Construction Certificate fee
|
|||
Progress Inspection / Re-inspection fee (Council is the PCA) |
$353.00 plus $110.00 per 100 m2 gross floor area
|
|||
Administration fee (If critical stage inspection missed) | $320.91 | $32.09 | $353.00 | |
Re-assessment fee (Council not the original PCA) |
50% of Construction Certificate fee as determined by Council
|
|||
Amendment to Construction Certificate |
50% of original construction certificate fee
|
NORTH SYDNEY COUNCIL | CITY STRATEGY | PLANNING & DEVELOPMENT CERTIFICATES | CONSTRUCTION CERTIFICATE | CONSTRUCTION CERTIFICATE - MIXED DEVELOPMENT
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Construction Certificate Fee – Works less than $5,000.00 | $267.27 | $26.73 | $294.00 | |
Construction Certificate Fee – Works from $5,001.00 to $10,000.00 | $534.55 | $53.45 | $588.00 | |
Construction Certificate Fee – Works from $10,001.00 to $50,000.00 | $1,066.36 | $106.64 | $1,173.00 | |
Construction Certificate Fee – Works from $50,001.00 to $1,000,000.00 | $2,665.45 | $266.55 | $2,932.00 | |
Construction Certificate Fee – Works from $1,000,001.00 to $2,000,000.00 | $3,730.91 | $373.09 | $4,104.00 | |
Construction Certificate Fee – Works greater than $2,000,001.00 |
$4,104.00 plus 0.2% of the value over $2,000,000.00
|
|||
Construction Certificate Fee – Per additional dwelling plus per 100m2 gross floor area (in addition to applicable fee) | $427.27 | $42.73 | $470.00 | |
Resubmitted Construction Certificate application (Previously refused by Council) |
50% of original Construction Certificate fee
|
|||
Progress Inspection / Re-inspection fee (Council is the PCA) |
$353.00 plus $110.00 per dwelling plus $110.00 per 100 m2 gross floor area
|
|||
Administration fee (If critical stage inspection missed) | $320.91 | $32.09 | $353.00 | |
Re-assessment fee (Council not the original PCA) |
50% of Construction Certificate fee as determined by Council
|
|||
Amendment to Construction Certificate |
50% of original construction certificate fee
|
NORTH SYDNEY COUNCIL | CITY STRATEGY | PLANNING & DEVELOPMENT CERTIFICATES | COMPLYING DEVELOPMENT CERTIFICATE
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Complying Development Certificate Fee – Works less than $10,000.00 | $800.91 | $80.09 | $881.00 | |
Complying Development Certificate Fee – Works from $10,001.00 to $50,000.00 | $1,066.36 | $106.64 | $1,173.00 | |
Complying Development Certificate Fee – Works from $50,001.00 to $1,000,000.00 | $2,131.82 | $213.18 | $2,345.00 | |
Complying Development Certificate Fee – Works from $1,000,001.00 to $2,000,000.00 | $3,197.27 | $319.73 | $3,517.00 | |
Complying Development Certificate Fee – Works greater than $2,000,001.00 |
$3,517.00 plus 0.2% of the value over $2,000,000.00
|
|||
Complying Development Certificate Fee – Subdivision |
$881.00 plus $510.00 per lot
|
|||
Advertising Fee (if required) | $470.00 | $47.00 | $517.00 | |
Complying Development Certificate Fee – Amended application |
50% of original Complying Development Certificate fee
|
|||
Amendment to Complying Development Certificate |
50% of original complying development certificate fee
|
NORTH SYDNEY COUNCIL | CITY STRATEGY | PLANNING & DEVELOPMENT CERTIFICATES | OCCUPANCY CERTIFICATE | OCCUPANCY CERTIFICATE - SINGLE DWELLING AND STRUCTURES ANCILLARY TO BUILDINGS (CLASS 10)
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Occupancy Certificate Fee | $320.91 | $32.09 | $353.00 | |
Occupancy Certificate Fee (works under $50,000.00) | $160.91 | $16.09 | $177.00 |
NORTH SYDNEY COUNCIL | CITY STRATEGY | PLANNING & DEVELOPMENT CERTIFICATES | OCCUPANCY CERTIFICATE | OCCUPANCY CERTIFICATE - MULTI-OCCUPANCY
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Occupancy Certificate Fee |
$523.00 plus $125.00 per assessment per dwelling
|
|||
Occupancy Certificate Fee (works under $50,000.00) | $160.91 | $16.09 | $177.00 |
NORTH SYDNEY COUNCIL | CITY STRATEGY | PLANNING & DEVELOPMENT CERTIFICATES | OCCUPANCY CERTIFICATE | OCCUPANCY CERTIFICATE - COMMERCIAL / INDUSTRIAL / RETAIL
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Occupancy Certificate Fee |
$523.00 plus $125.00 per 100 m2 gross floor area
|
|||
Occupancy Certificate Fee (works under $50,000.00) | $160.91 | $16.09 | $177.00 |
NORTH SYDNEY COUNCIL | CITY STRATEGY | PLANNING & DEVELOPMENT CERTIFICATES | OCCUPANCY CERTIFICATE | OCCUPANCY CERTIFICATE - MIXED DEVELOPMENT
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Occupancy Certificate Fee |
$523.00 plus $125.00 per dwelling plus $110 per 100 m2 gross floor area
|
|||
Occupancy Certificate Fee (works under $50,000.00) | $160.91 | $16.09 | $177.00 |
NORTH SYDNEY COUNCIL | CITY STRATEGY | PLANNING & DEVELOPMENT CERTIFICATES | CERTIFICATION REGISTER
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Registration of Certificates |
Submitting via the ePlanning portal private certifiers' issued requiring registration by Council (cost per certificate) including construction certificate, subdivision works certificate, occupation certificate, subdivision certificate or complying development certificate. |
NORTH SYDNEY COUNCIL | CITY STRATEGY | PLANNING & DEVELOPMENT CERTIFICATES | SUBDIVISION OR STRATA CERTIFICATE
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Lodgement Fee – Strata Certificate | $588.18 | $58.82 | $647.00 | |
Lodgement Fee – Strata Certificate (Per unit or lot) | $267.27 | $26.73 | $294.00 | |
Lodgement Fee – Subdivision Certificate | $647.00 | $0.00 | $647.00 | |
Lodgement Fee – Subdivision Certificate (Per unit or lot) | $647.00 | $0.00 | $647.00 | |
Lodgement of 88B Endorsement |
Refer to DA Consent condition review
|
|||
Signing of 88B Instrument |
Refer to DA Consent condition review
|
|||
Administration Fee – Signed documentation lodged with NSW Land & Property Management Authority | $236.00 | $0.00 | $236.00 | |
Administration Fee – Termination of strata scheme | $118.00 | $0.00 | $118.00 | |
Administration Fee – Subdivision Amendments / Lodgement errors |
50% of original Certificate fee
|
|||
Administration Fee – Strata Amendments / Lodgement errors |
50% of original Certificate fee
|
NORTH SYDNEY COUNCIL | CITY STRATEGY | DEVELOPMENT APPLICATIONS | STANDARD DEVELOPMENT APPLICATIONS
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
DA Fee – Works from $5,001.00 to $50,000.00 |
$220.00 plus additional $3 per $1,000 or part thereof of the estimated cost which exceeds $5,000
|
|||
DA Fee – Works from $50,001.00 to $250,000.00 |
$459.00 plus additional $3.64 per $1,000 or part thereof of the estimated cost which exceeds $50,000
|
|||
DA Fee – Works from $250,001.00 to $500,000.00 |
$1,509.00 plus additional $2.34 per $1,000 or part thereof of the estimated cost which exceeds $250,000
|
|||
DA Fee – Works from $500,001.00 to $1,000,000.00 |
$2,272.00 plus additional $1.64 per $1,000 or part thereof of the estimated cost which exceeds $500,000
|
|||
DA Fee – Works from $1,000,001.00 to $10,000,000.00 |
$3,404.00 plus additional $1.44 per $1,000 or part thereof of the estimated cost which exceeds $1,000,000
|
|||
DA Fee – Works greater than $10,000,000.00 |
$20,667.00 plus additional $1.19 per $1,000 or part thereof of the estimated cost which exceeds $10,000,000
|
|||
DA Fee – Public Buildings (school, hospital, police stations) |
Standard DA fee based on estimated cost
|
|||
DA Fee – Designated Development |
$1,198.00 plus standard DA fee based on estimated cost
|
|||
DA Fee – Integrated Development |
$183.00 submission fee for each approval body paid to Council at time of |
|||
DA Fee – Concurrence Development |
$183.00 submission fee for each approval body paid to Council at time of
lodgement of DA. The DPIE will invoice applicants $416 per each approval body through the planning portal. |
NORTH SYDNEY COUNCIL | CITY STRATEGY | DEVELOPMENT APPLICATIONS | STANDARD DEVELOPMENT APPLICATIONS - MINOR WORKS
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
DA Fee – Erection of Building or other works < $5,000 | $144.00 | $0.00 | $144.00 | |
DA Fee – Erection of New Dwelling House < $100,000 | $592.00 | $0.00 | $592.00 | |
DA Fee – Change of Use (no construction) | $371.00 | $0.00 | $371.00 | |
DA Fee – Advertising Signs |
$371.00 plus $93.00 for each additional advertisement or the fee calculated in accordance with EP&A Regs, whichever is the greater. |
|||
DA Fee – Public Buildings (school, hospital, police stations) |
Standard DA fee based on estimated cost
|
|||
DA Advertising Fee |
RE: Applicable DA Advertising Fee
|
NORTH SYDNEY COUNCIL | CITY STRATEGY | DEVELOPMENT APPLICATIONS | DEVELOPMENT APPLICATIONS - AMENDED PLANS
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
DA Fee – Amended Plans |
25% of original DA fee (Minor amendments - not required to be renotified)
50% of original DA fee (Major amendments - renotification required)
|
|||
DA Advertising Fee |
RE: Applicable DA Advertising Fee
|
NORTH SYDNEY COUNCIL | CITY STRATEGY | DEVELOPMENT APPLICATIONS | REVIEW OF DETERMINATION
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Review of Determination - Section 8.3 (Does not involve the erection of a building, the carrying out of a work or the demolition of a work or building) |
50% of original DA fee
|
|||
Review of Determination - Section 8.3 (Erection of a dwelling-house with an estimated construction cost of $100,000.00 or less) | $247.00 | $0.00 | $247.00 | |
Review of Determination - Section 8.3 (Any other development application) Estimated Cost - Up to $5,000.00 | $71.00 | $0.00 | $71.00 | |
Review of Determination - Section 8.3 (Any other development application) Estimated Cost - $5,001 - $250,000 |
$111.00 plus an additional $1.50 for each $1,000 (or part of $1,000) of estimated cost which exceeds $5,000
|
|||
Review of Determination - Section 8.3 (Any other development application) Estimated Cost - $250,001 - $500,000 |
$651.00 plus an additional $0.85 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $250,000
|
|||
Review of Determination - Section 8.3 (Any other development application) Estimated Cost - $500,001 - $1,000,000 |
$927.00 plus an additional $0.50 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $500,000 |
|||
Review of Determination - Section 8.3 (Any other development application) Estimated Cost - $1,000,001 - $10,000,000 |
$1,285.00 plus an additional $0.40 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $1,000,000
|
|||
Review of Determination - Section 8.3 (Any other development application) Estimated Cost - greater than $10,000,000 |
$6,167.00 plus an additional $0.27 for each $1,000 (or part of $1,000) by which the estimated cost exceeds $10,000,000
|
|||
Review of decision to reject development application - Section 8.2(1)(c) estimated cost - less than $100,000 | $71.00 | $0.00 | $71.00 | |
Review of decision to reject development application - Section 8.2(1)(c) estimated cost - $100,000 - $1,000,000 | $195.00 | $0.00 | $195.00 | |
Review of decision to reject development application - Section 8.2(1)(c) estimated cost - greater than $1,000,000 | $325.00 | $0.00 | $325.00 | |
DA Advertising Fee |
RE: Applicable DA Advertising Fee
|
NORTH SYDNEY COUNCIL | CITY STRATEGY | DEVELOPMENT APPLICATIONS | SECTIONS 4.55 & 4.56 APPLICATIONS
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
DA Fee – Section 4.55 (1) - Modifications involving minor error, misdescription or miscalculation |
$92.00 Maximum fee
|
|||
DA Fee – Section 4.55 (1A) & 4.56 - Modifications involving minimal environment impact |
50% of original DA fee up to a $839.00 maximum
|
|||
DA Fee – Section 4.55 (2) & 4.56 - Other modifications – Original application less than $100.00 |
50% of original DA fee plus notification costs
|
|||
DA Fee - Section 4.55 (2) & 4.56 Other modifications - Original application greater than $100.00 but does not involve the erection of a building, the carrying out of work or the demolition of a work or building. |
50% of original DA fee
|
|||
DA Fee - Section 4.55 (2) & 4.56 where the original application was for a dwelling house with an estimated cost of construction of $100,000 or less. | $247.00 | $0.00 | $247.00 | |
DA Fee - Section 4.55 (2) & 4.56 any other development up to an estimated cost of $5,000 | $71.00 | $0.00 | $71.00 | |
DA Fee - Section 4.55 (2) & 4.56 any other development application up to an estimated cost of $5,001-$250,000 |
$110.00 plus an additional $1.50 per $1,000 or part thereof of the estimated cost which exceeds $5,000
|
|||
DA Fee - Section 4.55 (2) & 4.56 any other development application up to an estimated cost of $250,001-$500,000 |
$651.00 plus an additional $0.85 per $1,000 or part thereof of the estimated cost which exceeds $250,000
|
|||
DA Fee - Section 4.55 (2) & 4.56 any other development application up to an estimated cost of $500,001-$1,000,000 |
$927.00 plus an additional $0.50 per $1,000 or part thereof of the estimated cost which exceeds $500,000
|
|||
DA Fee - Section 4.55 (2) & 4.56 any other development application up to an estimated cost of $1,000,001-$10,000,000 |
$1,285.00 plus an additional $0.40 per $1,000 or part thereof of the estimated cost which exceeds $1,000,000
|
|||
DA Fee - Section 4.55 (2) & 4.56 any other development application up to an estimated cost above $10,000,000 |
$6,167.00 plus an additional $0.27 per $1,000 or part thereof of the estimated cost which exceeds $10,000,000
|
|||
DA Fee - Section 4.55 (2) & 4.56 - additional fee if notice of application is required to be given under the Act | $866.00 | $0.00 | $866.00 | |
DA Fee - Section 4.55 (2) & 4.56 - additional fee for application that is accompanied by statement of qualified designer | $990.00 | $0.00 | $990.00 | |
DA Fee - Section 4.55 (2) & 4.56 - additional fee for application that is referred to design review panel for advice | $3,905.00 | $0.00 | $3,905.00 | |
DA Fee - Section 8.9 - appeal against determination of modification application under the Act |
50% of the fee payable for the application subject to appeal
|
|||
Advertising Fee - Payable for 4.55 (2) and all 4.56 applications |
RE: Applicable DA Advertising Fee
|
NORTH SYDNEY COUNCIL | CITY STRATEGY | DEVELOPMENT APPLICATIONS | LAND AND STRATUM SUBDIVISIONS
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Land Subdivision Fee – New Road |
$865.00 plus $65.00 per additional lot
|
|||
Land Subdivision Fee – No New Road |
$430.00 plus $53.00 per additional lot
|
|||
Strata Subdivision Fee |
$430.00 plus $65.00 per additional lot
|
|||
DA Advertising Fee |
RE: Applicable DA Advertising Fee
|
NORTH SYDNEY COUNCIL | CITY STRATEGY | DEVELOPMENT APPLICATIONS | ADVERTISING FEES
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
DA Advertising Fee – Value of works up to $5,000 | $294.00 | $0.00 | $294.00 | |
DA Advertising Fee – Value of works from $5,000 to $100,000 | $541.00 | $0.00 | $541.00 | |
DA Advertising Fee – Value of works from $100,001 to $2,999,999 | $716.00 | $0.00 | $716.00 | |
DA Advertising Fee – Value of works over $3,000,000 | $1,438.00 | $0.00 | $1,438.00 | |
DA Advertising Fee – Designated Development | $2,890.00 | $0.00 | $2,890.00 | |
DA Advertising Fee – Integrated Development | $1,438.00 | $0.00 | $1,438.00 | |
DA Advertising Fee - Other Development For Which A Community Participation Plan Requires Notice be Given | $1,438.00 | $0.00 | $1,438.00 | |
DA Advertising Fee - Prohibited Development | $1,438.00 | $0.00 | $1,438.00 | |
DA Advertising Fee – Amended Plans | $470.00 | $0.00 | $470.00 | |
Advertising Fee – Section 4.55(2) & 4.56 (payable for all 4.56 applications seeking to modify a court consent) | $470.00 | $0.00 | $470.00 | |
DA Advertising Fee – Review of Determination (submissions lodged with Council) |
100% of original DA Advertising fee to a maximum of $620.00
|
NORTH SYDNEY COUNCIL | CITY STRATEGY | DEVELOPMENT APPLICATIONS | DA CONSENT CONDITION REVIEWS
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Administration Fee – Consent condition concurrence, per condition | $470.00 | $0.00 | $470.00 |
NORTH SYDNEY COUNCIL | CITY STRATEGY | DEVELOPMENT APPLICATIONS | TEMPORARY TIE BACK ANCHORS
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Permit Application Fee | $370.00 | $0.00 | $370.00 | |
Permit Fee (per anchor) | $792.00 | $0.00 | $792.00 |
NORTH SYDNEY COUNCIL | CITY STRATEGY | DEVELOPMENT APPLICATIONS | HOARDING PERMIT
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Permit Application Fee – Non Refundable | $169.00 | $0.00 | $169.00 | |
Weekly Hoarding Permit Fee – Occupied or Unoccupied |
$21.00 Per m2 of Council Owned Property/Land per week
|
|||
Weekly Hoarding Permit Fee – Minimum charge | $433.00 | $0.00 | $433.00 |
NORTH SYDNEY COUNCIL | CITY STRATEGY | DEVELOPMENT APPLICATIONS | REFERRAL TO PLANNING PANELS
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Additional Fee – Referral to Sydney North Planning Panel (SNPP) |
$3,905.00 Maximum Fee |
NORTH SYDNEY COUNCIL | CITY STRATEGY | OTHER PLANNING SERVICES | PRE-DEVELOPMENT APPLICATION CONSULTATION SERVICES
Name |
2024/2025 Fee (excl. GST) |
2024/2025 GST |
2024/2025 Fee (incl. GST) |
|
Consultation Fee – Small scale single dwellings & duplexes | $747.27 | $74.73 | $822.00 | |
Meeting with Team Leader, Assessment Officers and Administration Assistant (minutes of meeting to be taken)
|
||||
Consultation Fee – Residential flat buildings, Commercial alterations & additions only | $1,034.55 | $103.45 | $1,138.00 | |
Meeting with Team Leader, Assessment Officers & Administration Assistant (minutes to be taken)
|
||||
Consultation Fee – Large scale developments for mixed use, new RFB | $1,550.91 | $155.09 | $1,706.00 | |
Meeting with Executive Planners, Team Leader, Relevant Referring Officers & Administration Assistant (minutes to be taken)
|
||||
Consultation Fee – Strategic issues | $1,448.18 | $144.82 | $1,593.00 | |
Meeting with Strategic Manager plus Strategic Officers & Administration Assistant (Minutes of meeting taken)
|